Most of our work is located in the Netherlands (see below for a selection of our work). Our international activities consist of presentations, research and collaboration with design firms in other countries.

The thread throughout our projects is that they are challenging. High-quality advise is required because of the innovative character, size and complexity of the projects. 

 Projects

UMC Radboud (Nijmegen)

Radboud University Medical Centre is going to model the specifications for the new research tower with an application of ICOP, BruifBuilder.

The building will hold a cyclotron, offices and laboratories. A preliminary design will also be added to the specifications model. Based on this model the project will be procured as a design & build contract. In that stage the model will be extended with the VerificationManager to systematically judge the design proposals.

 


Province of Utrecht (Utrecht)

ICOP supports the Province of Utrecht with producing a contractable project brief for the demolition and new development of its accomodation.

The project will probably be procured as a design and build contract. At this moment employees of the provincial authority and their consultants are setting up all specifications. ICOP will make sure that these are put into a digital model in a consistent and contractable manner.

 


Altrecht (Den Dolder)

ICOP supports Altrecht with creating a new workplace concept and setting up the project brief for a new accomodation for the board of directors and staff.

Based on an analysis of the work processes, facility services and company culture, ICOP will determine the accomodation demand.

 


Organon/AKZO Nobel (Oss)

ICOP has already been involved with the development, implementation and evaluation of a new office concept (250 employees) since 2001.

ICOP has also been responsible for the housing advice for a new location in 2006.

 


Accomodation Informatie Beheer Groep and Tax Office Groningen

This PFI-project involved an integrated Design, Build, Finance, Maintain en Operate (DBFMO) contract.

This type of contract comprised the design, build, finance, exploitation and maintenance of the office building for the IB-Group and the tax service as well as a parking garage with a public garden, water display and possibly a pavilion for commercial use.

  • Modelling the output specifications (housing and services)
 


Tax Office Doetinchem

The Dutch counsel of ministers agreed to perform 4 government housing projects as Public Private Partnerships in april 2005. The new office for the Dutch tax office in Doetinchem has been one of the first projects to actually start.

The project has been performed as a Design Build Finance and Maintain contract. This means that not only housing but also services have been part of the contract.

  • Modelling the output specifications (housing and services)
 


Detention Centre Rotterdam

A new detention centre at Rotterdam-Airport assigned by Dienst Justitiƫle Inrichtingen. Location: a newly developed company site at Rotterdam-Airport.

The new detention centre has to provide space for 560 inmates. The complex will also be providing limited jail room for the royal service. The complex will be the property of the Dutch government.

  • Modelling the output specifications (housing and services)
 


Kromhout Barracks Utrecht

The construction and design of the Kromhout Barracks at Utrecht and the exploitation of the complex will take place through a PFI contract.

 


New accomodation Meander Medical Centre

The two present accommodations will be replaced by one new accommodation at Amersfoort. This new hospital is expected to open its doors in 2010.

 


Province of Noord-Holland

The interior of the present accommodation will be renovated and new offices will be built to support the reorganisation of Province of Noord-Holland.

  • Workplace development and implementation
  • Requirements management
 


Municipality of Gouda

The new town hall (20.000 m2) will be located near Gouda central train station and will be part of a larger development plan.

  • Workplace development and implementation
  • Requirements management
  • Selection of Architects
 


Ministerie van Financiƫn

In may 2001 it became clear that climate problems could not be solved with a simple adaptation. At the end of 2001 management decided that a complete renovation should be performed.

The office building, after renovation, will be finished in 2008.

  • Modelling output specifications
 


  